GetaGrip!™ Ending
Roll RPM Calculator
The
rolls must move the lumber from one side of the production line to the
other, during the time it takes for the production line to move the
lumber the length of the rolls.
This difficult calculation is made easy with our
exclusive Ending Roll RPM Calculator featured below.
-
Finding just the right ratio of lugs per minute to ending roll RPM involves
5 variables. It is critical for optimizing all
ending roll systems and transfer roll cases.
-
Optimum velocity for the lumber
is fast enough to hit the target and slow enough to minimize bounce back.
-
Maximum traction with GetaGrip!™
holds the lumber in position.
-
For ending rolls, the
ratio of lugs/min to
roll RPM stays the same when the lugs/min changes. Mill designs need to
tie the 2 together. If the lumber line stops, slows or speeds up, so do
the rolls.
Replace the blue numbers with your
own. To calculate, click on the Total or press your 'Tab' key. Want us to figure it out? Call toll free
in USA & Canada 1-888-339-4747
To Optimize...
GetaGrip!™
and Adjust Your Roll RPM
Now
Select The Belt Pulley Or Sprocket You Need To Do It

|